All 18 Piles are received. So the preparations for the loud-out and seafastening can start.

The Edvard Grieg field (formerly Luno), is located in production licence PL 338, in the Utsira High area of the Norwegian North Sea. It lies at a water depth of 354ft. The field is expected to start production the last quarter of 2015. It is being developed at an estimated cost of $4bn.

Lundin Petroleum is the operator of PL 338, with a 50% interest. The other partners are Wintershall Norge with 30% and RWE Dea Norge with a 20% interest. PL 338 was granted to Lundin Petroleum in 2004.